Wadhurst Embankment Stabilisation

The Ngage Geotechnical teams assisted BAM with over 14000m of soil nails and rock bolts installed and 17000m2 of Tecco mesh laid. This engineering solution is designed to last more than 60 years and will make the key route between London and Hastings safer with fewer disruptions for passengers.

Client
BAM Ritchies/Nuttall

Year
2021 to 2022

Discipline
Rope Access Level 1’s

Rope Access Level 3’s,

Plant Operators,

Geotechnical Operatives